Some features can be verified with simple tools; others need fixtures, specialist instruments or tests. Planning early avoids reaching the end of manufacture with a requirement that cannot be checked in the available setup.
Practical checks
- Identify the drawing revision and list characteristics without losing notes or general tolerances.
- Choose suitable methods and define the reference or datum setup.
- Agree sample size or frequency according to risk and the customer requirement.
- Record who reviews deviations and how the lot is identified.
Record the finding against the actual part, machine or drawing revision. A useful check identifies both the observation and the conditions under which it was made, so another person can review it.
Common mistakes to avoid
- Do not inspect only the dimensions that are easy to measure.
- Do not assume a supplier’s standard report covers every requirement on the drawing.
What to collect before a review
- Released drawing
- Quantity and risk information
- Customer reporting and acceptance requirements
Send clear original files where available. Mark uncertain dimensions, missing information and the result you need. Separate confirmed requirements from assumptions instead of filling the gaps with guessed specifications.
The next decision
Agree the plan before production, then keep results linked to the part or lot. Changes to the drawing, process or inspection method should trigger a review of the plan.